Temporary Surface Water Management Scheme

After pricing a large scale Surface Water scheme at Seale Lodge for Suez in 2015, which was put on hold due to some design issues, Pope Plant Ltd were asked to construct a temporary scheme to satisfy the local planning authority.

The works involved constructing a GCL lined cut off ditch to stop water existing the site at the main entrance.

A large soakaway was excavated on the site boundary to capture the water from the new cut off ditch.

Aggregate weirs were installed on the main haul road and directed to grass restored areas to prevent water run off.

The works were completed as temporary solution whilst further design work is undertaken by Suez.

 

“The works involved constructing a GCL lined cut off ditch to stop water existing the site at the main entrance.”

Description of the image

SITA-E-FARR 2015

“The success of the project was mainly down to the way Craig Pope and his colleagues understood the client’s needs, worked with an excellent spirit of collaboration and interfaced with all the parties to complete the project.
I would recommend others to seriously consider the services of Pope Plant”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Thursday March 21st, 2024
Pope Plant LTD
Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow 
Yard empty Mid MarchπŸ’ͺ

Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow
Yard empty Mid MarchπŸ’ͺ
... See MoreSee Less

Comment on Facebook

That’s the way to do it πŸ‘Œ

Tuesday February 6th, 2024
Pope Plant LTD
Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3  x Volvo ADT’s, Cat D6TLGP and John Deere Tractor

Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3 x Volvo ADT’s, Cat D6TLGP and John Deere Tractor
... See MoreSee Less

Comment on Facebook

Nice to see you doing well Craig. A nice looking machine and a great choice. Wishing you good luck and a positive future.

Looks good Craig fair play to you πŸ‘

Looking good Craig πŸ‘ πŸ‘Œ

Good work πŸ‘πŸ‘

Tuesday January 30th, 2024
Pope Plant LTD
New Decals arrived to add to our fleet of Plant to celebrate the 20th year of Business for Pope Plant LtdπŸ‘πŸ»

New Decals arrived to add to our fleet of Plant to celebrate the 20th year of Business for Pope Plant LtdπŸ‘πŸ» ... See MoreSee Less

Comment on Facebook

How did I ever let you get in this game , 20 years of hard labour but not many more to go 😎

Congratulations Pope plant on reaching 20 years. That's a nice logo to put on your fleet to celabrate as well. Wishing you many more positive and successfull years to come.

Well done Craig πŸ‘πŸ‘

Well done Craig and that logo is so much better than your first one if you remember πŸ™ˆπŸ˜‚πŸ˜‚πŸ˜‚

Congratulations πŸ‘πŸ»πŸ‘πŸ»

Well done pope plant from ex John Jones dumper driver

Worked for you driving a dumper at St Mary hoo about 1997 you had a few old volvo dumpers think the job was for biffa

Nice one bert πŸ‘ŒπŸ»

View more comments