Capping, Restoration and Surface Water Management

Pope Plant Ltd obtained access to SITA UK tendering process for the first time. The company was invited to view and price a large restoration project at Albury Sandpit. We was deemed a competitive tender and awarded under ICE conditions of contract 7th Edition Measurement Version by the acting consultancy, SLR Consulting Ltd.

The works began in late June and consisted of :

  • Supply and installing 1mm double textured LLDPE geomembrane, Geotextile and Geocomposite all for the capping areas.
  • Expose 700m Geomembrane tie-in Regulate 24’000m2 capping area
  • Excavate, haul & place 38’000m3 subsoils and 24’000m3 topsoil to various depths and areas.
  • Supply and Install 1300m of GCL lined surface water management ditches, construct lagoons and sumps
  • Hydro seed 120’000m2 to the correct specification
  • Supply and install aggregate tracks.

Although the works were beyond the given programme it was accepted by the client and consultant that this was unavoidable but by offering cost saving ideas during the contract and offering solutions by the management team, the works were still completed within budget including additionals and before the bad weather set in.

Description of the image

Description of the image

SITA-E-FARR 2015

“The success of the project was mainly down to the way Craig Pope and his colleagues understood the client’s needs, worked with an excellent spirit of collaboration and interfaced with all the parties to complete the project.
I would recommend others to seriously consider the services of Pope Plant”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons

Tuesday February 25th, 2020

Pope Plant LTD
First lowloader to enter our new premises to pick up our D6K2LGP 
Off to work for a new client

First lowloader to enter our new premises to pick up our D6K2LGP
Off to work for a new client
... See MoreSee Less

Comment on Facebook

The new yard looks good Craig

She arrived safe and sound!

Is that Jamie driving that low loader Craig

Pukka little dozer

Tuesday January 28th, 2020

Pope Plant LTD
For Sale
D6TXL 2010
9283hrs
Good U/C
GPS ready
Very tidy well maintained Dozer
See website for more info from 29/01/20
£75’000

http://popeplant.co.uk/plant-sale/cat-d6t-xl/

For Sale
D6TXL 2010
9283hrs
Good U/C
GPS ready
Very tidy well maintained Dozer
See website for more info from 29/01/20
£75’000

popeplant.co.uk/plant-sale/cat-d6t-xl/
... See MoreSee Less

Wednesday January 15th, 2020

Pope Plant LTD
Aylesford Depot is progressing well - Drainage being sorted, concrete down and electrics on .... watch this space for more updates

www.popeplant.co.uk

Call 07711404067 to discuss your earthworks, plant hire or Service Engineer requirements

Aylesford Depot is progressing well - Drainage being sorted, concrete down and electrics on .... watch this space for more updates

www.popeplant.co.uk

Call 07711404067 to discuss your earthworks, plant hire or Service Engineer requirements
... See MoreSee Less