RUNFOLD AREA A RESTORATION

At last Pope's move on to the Restoration of Area A at the Suez site now that ecology work is complete within this area.

The pressure was now firmly on to get the site restored, seeded and completed before the weather turned.
The works were unlike a normal restoration project where soils are just placed.
the works consisted of loose soils placement procedure after ripping of the ground to 400mm with our D6T LGP dozer. The soils had to be excavated from  various stockpiles around the site and placed to various thicknesses for tree planting and seeding.
The works also consisted of excavating surface water lagoons and installing extremely wide topsoil lined surface water ditches. Our Service engineer was required to fabricate a bucket to suit specification.
The works were completed with only days to spare before the weather broke for the winter.


“The pressure was now firmly on to get the site restored, seeded and completed”

Red Materials Ltd Testimonial 2018

“All work has been carried out in accordance with an approved CQA Plan and has been undertaken to the highest standards.

Craig Pope and his team are knowledgeable, approachable and have an excellent attitude towards Health & Safety

I would strongly recommend the services of Pope Plant Ltd.”

Find out more about

LANDFILL

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons

Friday September 18th, 2020

Pope Plant LTD
Highlighting the extent of this Cell build excavation with our 35t Komatsu excavator just visible in the bottom πŸ‘

Highlighting the extent of this Cell build excavation with our 35t Komatsu excavator just visible in the bottom πŸ‘ ... See MoreSee Less

Friday September 18th, 2020

Pope Plant LTD
Ever increasing landfill Cell
Adding an awkward chunk of clay engineering whilst the sun shines🌞
One of the largest, if not the largest landfill Cells constructed in the South East this year.
Cell 9 almost complete πŸ‘Œ

Ever increasing landfill Cell
Adding an awkward chunk of clay engineering whilst the sun shines🌞
One of the largest, if not the largest landfill Cells constructed in the South East this year.
Cell 9 almost complete πŸ‘Œ
... See MoreSee Less

Comment on Facebook

Looks great Craig,Cracking job mate.πŸ‘

View more comments

Thursday August 6th, 2020

Pope Plant LTD
Finally after overcoming massive ground water problems , variations to the contract and unforeseen issues!
We finally achieved formation and began clay engineering works this week on one of the largest, if not the largest, landfill Cells under construction in the South of England
Onwards and upwards πŸ‘

Finally after overcoming massive ground water problems , variations to the contract and unforeseen issues!
We finally achieved formation and began clay engineering works this week on one of the largest, if not the largest, landfill Cells under construction in the South of England
Onwards and upwards πŸ‘