FISHING LAKE CONSTRUCTION

Pope Plant Ltd were appointed preferred contractor to construct a twelve acre fishing lake and three stock ponds.

The work consisted of excavating unsuitable material from perimeter key trench and replacing with a clay material. The topsoil was then

stripped and placed to the outside footprint of the lake. The earthwork was then a cut and fill operation to construct lake embankments and required depth of water. Several islands and gravel bars were completed before re-placing the topsoil and seeding.

“construct a twelve acre fishing lake and three stock ponds.”


                  

CORY-P-STREAK 2011

 

“Pope Plant have proved to be a capable and effective contractor who have completed projects set by Cory Resource Management in a timely and efficient manner. Craig Pope ( Director), has ensured that all the projects undertaken by his company have been met within budget and time constraints set by CERM.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons