FISHING LAKE CONSTRUCTION

Pope Plant Ltd were appointed preferred contractor to construct a twelve acre fishing lake and three stock ponds.

The work consisted of excavating unsuitable material from perimeter key trench and replacing with a clay material. The topsoil was then

stripped and placed to the outside footprint of the lake. The earthwork was then a cut and fill operation to construct lake embankments and required depth of water. Several islands and gravel bars were completed before re-placing the topsoil and seeding.

“construct a twelve acre fishing lake and three stock ponds.”


                  

CORY-P-STREAK 2011

 

“Pope Plant have proved to be a capable and effective contractor who have completed projects set by Cory Resource Management in a timely and efficient manner. Craig Pope ( Director), has ensured that all the projects undertaken by his company have been met within budget and time constraints set by CERM.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons

Friday September 18th, 2020

Pope Plant LTD
Highlighting the extent of this Cell build excavation with our 35t Komatsu excavator just visible in the bottom πŸ‘

Highlighting the extent of this Cell build excavation with our 35t Komatsu excavator just visible in the bottom πŸ‘ ... See MoreSee Less

Friday September 18th, 2020

Pope Plant LTD
Ever increasing landfill Cell
Adding an awkward chunk of clay engineering whilst the sun shines🌞
One of the largest, if not the largest landfill Cells constructed in the South East this year.
Cell 9 almost complete πŸ‘Œ

Ever increasing landfill Cell
Adding an awkward chunk of clay engineering whilst the sun shines🌞
One of the largest, if not the largest landfill Cells constructed in the South East this year.
Cell 9 almost complete πŸ‘Œ
... See MoreSee Less

Comment on Facebook

Looks great Craig,Cracking job mate.πŸ‘

View more comments

Thursday August 6th, 2020

Pope Plant LTD
Finally after overcoming massive ground water problems , variations to the contract and unforeseen issues!
We finally achieved formation and began clay engineering works this week on one of the largest, if not the largest, landfill Cells under construction in the South of England
Onwards and upwards πŸ‘

Finally after overcoming massive ground water problems , variations to the contract and unforeseen issues!
We finally achieved formation and began clay engineering works this week on one of the largest, if not the largest, landfill Cells under construction in the South of England
Onwards and upwards πŸ‘
... See MoreSee Less