ENOVERT - BELLHOUSE - 2019

Cell 8 Engineering at Bellhouse LFS commenced a bit late in the year but with the hope that the weather would hold.

The works were for a long existing client of ours but who had recently changed names(previously Cory Environmental Ltd)
The works involved
Batter toe drain and side wall riser installation
Excavation to formation
Clay Engineering to floor and 2 awkward shaped batters with lots of different shaped contours
Textile and drainage blanket installation
Sump and monitoring point construction
The D6T LGP fully equipped with our recent purchase of GPS was a god send of getting this Cell completed literally within 10 mins of the heavens opening and not stopping through October.
Phew this was a close one but was completed on time and within budget including additional day works.

COMPLETED ON TIME AND IN BUDGET


Find out more about

EARTHWORKS

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons

Friday May 15th, 2020

Pope Plant LTD
At last we have some plant going out the gate to work on a new AD Plant project in the Midlands
New Covid procedures and policies are in place along with individual operator kits.
Letโ€™s cautiously and safely as possible get the economy going again which is what construction does๐Ÿ‘

At last we have some plant going out the gate to work on a new AD Plant project in the Midlands
New Covid procedures and policies are in place along with individual operator kits.
Letโ€™s cautiously and safely as possible get the economy going again which is what construction does๐Ÿ‘
... See MoreSee Less

Comment on Facebook

When are you heading to Colchester mate.๐Ÿ‘

Keep the tracks turning mate ๐Ÿ‘๐Ÿ‘๐Ÿ‘๐Ÿ‘๐Ÿ‘

Thursday March 12th, 2020

Pope Plant LTD
Our smallest excavator on the fleet had a busy day yesterday installing ducting and new electrical cable to the Jetty in a boat yard in Gravesend.
It was a race against time to beat the high Thames Spring tide.
Another client happy๐Ÿ˜€

Our smallest excavator on the fleet had a busy day yesterday installing ducting and new electrical cable to the Jetty in a boat yard in Gravesend.
It was a race against time to beat the high Thames Spring tide.
Another client happy๐Ÿ˜€
... See MoreSee Less

Saturday March 7th, 2020

Pope Plant LTD
New line marking at new Pope Plant HQ๐Ÿ‘
Does it mean Iโ€™m important now as I have my own parking space๐Ÿ˜€

New line marking at new Pope Plant HQ๐Ÿ‘
Does it mean Iโ€™m important now as I have my own parking space๐Ÿ˜€
... See MoreSee Less

Comment on Facebook

You made it big time! ๐Ÿ˜‚