Construction of one of the largest landfill cells in SE ..

Works were awarded for the construction of the largest landfill Cell in the South of England to create waste void for our repeat client Enoverts.

The working area had previously been extracted of minerals above gault clay by Tarmacs then handed over to our client.

As the cut/fill works of 36’000m3 progressed it became evident that an ingress water issue had to be addressed and controlled within the formation. This was a challenging prospect at times.

Due to this unforeseen element of the works and the ever increasing need for waste void, it was decided by our client to split the Cell development in order to provide the void space before the Winter months were upon us.

The Cell 9 design changed during works and build volumes of clay engineering to basal, side slopes and intercell bunds along with Geotextile and aggregate placement were reduced from original tender stage.

The Construction of leachate sump and 2 monitoring points to specification,  along with leachate collection pipework were completed.

All the works were under the strict supervision of a CQA engineer.

Although the works were reduced, Pope Plant Ltd provided the much needed waste void in time, given the issues that were overcome during construction.

Pope Plant Ltd anticipate returning in 2021

 

“it’s been a pleasure and thanks to you and your lads”

M Silvester Enoverts


Find out more about

LANDFILL

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Monday April 15th, 2024
Pope Plant LTD
We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility 
Start date Mon 22nd April for the right candidate 
Message me for more details if interested or email
craig@popeplant.co.uk

We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility
Start date Mon 22nd April for the right candidate
Message me for more details if interested or email
craig@popeplant.co.uk
... See MoreSee Less

Thursday March 21st, 2024
Pope Plant LTD
Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow 
Yard empty Mid March💪

Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow
Yard empty Mid March💪
... See MoreSee Less

Comment on Facebook

That’s the way to do it 👌

Tuesday February 6th, 2024
Pope Plant LTD
Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3  x Volvo ADT’s, Cat D6TLGP and John Deere Tractor

Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3 x Volvo ADT’s, Cat D6TLGP and John Deere Tractor
... See MoreSee Less

Comment on Facebook

Nice to see you doing well Craig. A nice looking machine and a great choice. Wishing you good luck and a positive future.

Looks good Craig fair play to you 👍

Looking good Craig 👍 👌

Good work 👍👍