Clay Mineral Cap & GCL Capping

Pope Plant Ltd was hired on a day work basis to cap the slopes of the landfill with a clay mineral site derived material.

The works comprised of moving circa 10’000m3 of clay on a long haul under the CQA supervision from Terraconsult Ltd.

The clay was placed in 250mm layers and compacted with vibrating padfoot roller to achieve the required testing specification.

Once the clay stockpiles were exhausted it was the preferred route of Cory’s to install 15’000m2 of GCL capping to the crown of the landfill. The area was regulated and compacted in preparation for installing the GCL. This part of the works was carried out on a price work basis.

 

“The area was regulated and compacted in preparation for installing the GCL”


                  

CORY-M-HARLING 2011

 

“Pope Plant Ltd are continually asked back to tender as on site issues are dealt with effectively and fairly without any claims being submitted as Craig does NOT work on a claims basis.

The work is always carried out to a high standard on time and budget with a 100% Health and safety record. Furthermore Craig is who we always deal with takes ownership of the work and keeps us informed of issues which re always sorted to the best interest of all concerned.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Thursday April 25th, 2024
Pope Plant LTD

... See MoreSee Less

Thursday April 25th, 2024
Pope Plant LTD
Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.

Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.
... See MoreSee Less

Comment on Facebook

Street pads too - she won’t have had a hard life mate. πŸ‘

Nice purchase bud.. πŸ€™πŸ»

Looks a tidy bit of kit

Looks tidy mate πŸ‘πŸ‘

Thoroughly enjoyed my first week for Pope Plant LTD πŸ‘

View more comments

Monday April 15th, 2024
Pope Plant LTD
We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility 
Start date Mon 22nd April for the right candidate 
Message me for more details if interested or email
craig@popeplant.co.uk

We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility
Start date Mon 22nd April for the right candidate
Message me for more details if interested or email
craig@popeplant.co.uk
... See MoreSee Less