Capping, Restoration and Surface Water Management

Pope Plant Ltd obtained access to SITA UK tendering process for the first time. The company was invited to view and price a large restoration project at Albury Sandpit. We was deemed a competitive tender and awarded under ICE conditions of contract 7th Edition Measurement Version by the acting consultancy, SLR Consulting Ltd.

The works began in late June and consisted of :

  • Supply and installing 1mm double textured LLDPE geomembrane, Geotextile and Geocomposite all for the capping areas.
  • Expose 700m Geomembrane tie-in Regulate 24’000m2 capping area
  • Excavate, haul & place 38’000m3 subsoils and 24’000m3 topsoil to various depths and areas.
  • Supply and Install 1300m of GCL lined surface water management ditches, construct lagoons and sumps
  • Hydro seed 120’000m2 to the correct specification
  • Supply and install aggregate tracks.

Although the works were beyond the given programme it was accepted by the client and consultant that this was unavoidable but by offering cost saving ideas during the contract and offering solutions by the management team, the works were still completed within budget including additionals and before the bad weather set in.

Description of the image

Description of the image

SITA-E-FARR 2015

“The success of the project was mainly down to the way Craig Pope and his colleagues understood the client’s needs, worked with an excellent spirit of collaboration and interfaced with all the parties to complete the project.
I would recommend others to seriously consider the services of Pope Plant”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Thursday April 25th, 2024
Pope Plant LTD

... See MoreSee Less

Thursday April 25th, 2024
Pope Plant LTD
Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.

Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.
... See MoreSee Less

Comment on Facebook

Street pads too - she won’t have had a hard life mate. 👍

Nice purchase bud.. 🤙🏻

Looks a tidy bit of kit

Looks tidy mate 👍👍

Thoroughly enjoyed my first week for Pope Plant LTD 👍

View more comments

Monday April 15th, 2024
Pope Plant LTD
We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility 
Start date Mon 22nd April for the right candidate 
Message me for more details if interested or email
craig@popeplant.co.uk

We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility
Start date Mon 22nd April for the right candidate
Message me for more details if interested or email
craig@popeplant.co.uk
... See MoreSee Less