RUNFOLD AREA A RESTORATION

At last Pope's move on to the Restoration of Area A at the Suez site now that ecology work is complete within this area.

The pressure was now firmly on to get the site restored, seeded and completed before the weather turned.
The works were unlike a normal restoration project where soils are just placed.
the works consisted of loose soils placement procedure after ripping of the ground to 400mm with our D6T LGP dozer. The soils had to be excavated from  various stockpiles around the site and placed to various thicknesses for tree planting and seeding.
The works also consisted of excavating surface water lagoons and installing extremely wide topsoil lined surface water ditches. Our Service engineer was required to fabricate a bucket to suit specification.
The works were completed with only days to spare before the weather broke for the winter.


“The pressure was now firmly on to get the site restored, seeded and completed”

Red Materials Ltd Testimonial 2018

“All work has been carried out in accordance with an approved CQA Plan and has been undertaken to the highest standards.

Craig Pope and his team are knowledgeable, approachable and have an excellent attitude towards Health & Safety

I would strongly recommend the services of Pope Plant Ltd.”

Find out more about

LANDFILL

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Tuesday May 7th, 2024
Pope Plant LTD
We are still hiring!!
Last minute let down🤯
Looking for an excavator operator for tomorrow if possible at a soil treatment facility in Surrey
CIS only please apply
Can cover until Monday 13th if tomorrow is too early and before I put the position out to agencies to fill.
Please email me your details 
craig@popeplant.co.uk

We are still hiring!!
Last minute let down🤯
Looking for an excavator operator for tomorrow if possible at a soil treatment facility in Surrey
CIS only please apply
Can cover until Monday 13th if tomorrow is too early and before I put the position out to agencies to fill.
Please email me your details
craig@popeplant.co.uk
... See MoreSee Less

Thursday May 2nd, 2024
Pope Plant LTD
Been a bit of a rush preparing this one
Apart from the hand painted counterweight it’s pretty clean
No time to rub down, fill and spray properly as off to work next week.
Full service inc Hepa filters fitted for the soil treatment facility it’s off to next week in Hertfordshire
Street pads came off nicely leaving like new  grousers on the track padsđź‘Ť

Been a bit of a rush preparing this one
Apart from the hand painted counterweight it’s pretty clean
No time to rub down, fill and spray properly as off to work next week.
Full service inc Hepa filters fitted for the soil treatment facility it’s off to next week in Hertfordshire
Street pads came off nicely leaving like new grousers on the track padsđź‘Ť
... See MoreSee Less

Comment on Facebook

Looks good mate fair play to you and your team

Just to add we didn’t paint counterweight !!

Looks well tidy great job đź‘Ť

Lovely job looking good đź’Şđź’Şđź‘Ť

Thursday April 25th, 2024
Pope Plant LTD

... See MoreSee Less