PHASED CAPPING

Redhill Landfill Southern Area Phased Capping involved the excavation of approximately 110’000m3 of existing membrane capping and soils on a phase by phase basis.

The soils were hauled and placed to temporary stockpiles for later use within the works. The old membrane cap was disposed of to the active landfill.

The client then filled the newly created void with waste from various sources. Upon completetion of filling the area was then made available for re-capping.

Preparation of waste formation was required to receive waste regulation layer. Once regulation material was placed a 0.5mm LLDPE membrane was installed using the lap and lay method. A Geotextile was then placed over the membrane for protection. Conformance testing was completed by a UKAS accredited laboratory.

When the permanent capping was complete, soils were then excavated, hauled and placed to a depth of 1 metre to restore the area.

Finally a surface water management system was installed.

“The old membrane cap was disposed of to the active landfill”


                  

BWSL-A-COLEMAN 2011

 

“Any future employer of this company will soon come to note their commitment and ability to complete a project within budget and without undue compensation events.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Thursday April 25th, 2024
Pope Plant LTD

... See MoreSee Less

Thursday April 25th, 2024
Pope Plant LTD
Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.

Another Komatsu 210 incoming to the fleet.
Number 7
A bit earlier in year than previously bought but low houred and no Adblue.
Purchased online without viewing so hope as good as the pictures.
... See MoreSee Less

Comment on Facebook

Street pads too - she won’t have had a hard life mate. 👍

Nice purchase bud.. 🤙🏻

Looks a tidy bit of kit

Looks tidy mate 👍👍

Thoroughly enjoyed my first week for Pope Plant LTD 👍

View more comments

Monday April 15th, 2024
Pope Plant LTD
We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility 
Start date Mon 22nd April for the right candidate 
Message me for more details if interested or email
craig@popeplant.co.uk

We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility
Start date Mon 22nd April for the right candidate
Message me for more details if interested or email
craig@popeplant.co.uk
... See MoreSee Less