RED MATERIALS RUNFOLD AREA C LIFT 2
Following on from extensive works at the Suez site in Runfold in 2017 for Red Materials Ltd, as part of an on-going project of Cell Engineering, GCL Capping and Restoration works, Pope Plant Ltd mobilised to site to carry out Clay engineering lift No.2 within Area C.
The works comprised of a 2m lift in 250mm clay layers, installed to the horizontal, Rolled, Tested to meet spec and trimmed back to avoid using Non-Hazardous imported material void space.
Once trimmed back the clay leaves a minimum 1.1m clay barrier against the sand Quarry face.
The works were completed within 2 weeks in preparation for EA approval.
Red Materials Ltd Testimonial 2018
“All work has been carried out in accordance with an approved CQA Plan and has been undertaken to the highest standards.
Craig Pope and his team are knowledgeable, approachable and have an excellent attitude towards Health & Safety
I would strongly recommend the services of Pope Plant Ltd.”