CLAY ENGINEERING

After Pope Plant Ltd completed the mass excavation of Cell 7 at Greatness Landfill at the end of 2010, we were required to come back in February 2011 and clay engineer the new Cell.

The Cell had been left over the winter months and we were required to de-water the Cell where it was then identified that there was water ingress through the Cell batter formation from redundant drainage pipes for the old brickworks.

Pope Plant Ltd installed a drainage and pumping system behind the Cell formation. Once complete, clay was excavated from stockpile, hauled, placed and compacted to form 600mm of engineered seal. Intercell bunds and leachate monitoring sumps were then installed in preparation for the client to install leachate management and control system.

“We installed a drainage and pumping system behind the Cell formation”


                  

CORY-P-STREAK 2011

 

“Pope Plant have proved to be a capable and effective contractor who have completed projects set by Cory Resource Management in a timely and efficient manner. Craig Pope ( Director), has ensured that all the projects undertaken by his company have been met within budget and time constraints set by CERM.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Monday April 15th, 2024
Pope Plant LTD
We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility 
Start date Mon 22nd April for the right candidate 
Message me for more details if interested or email
craig@popeplant.co.uk

We are hiring!!
Looking for an excavator operator for a site in Surrey
Must have CPCS or Npors
Own transport to site
Working alongside other 21t excavators and ADT’s of ours on soil treatment facility
Start date Mon 22nd April for the right candidate
Message me for more details if interested or email
craig@popeplant.co.uk
... See MoreSee Less

Thursday March 21st, 2024
Pope Plant LTD
Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow 
Yard empty Mid March💪

Been lonely in the yard for this ADT
Last item of plant off out to work tomorrow
Yard empty Mid March💪
... See MoreSee Less

Comment on Facebook

That’s the way to do it 👌

Tuesday February 6th, 2024
Pope Plant LTD
Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3  x Volvo ADT’s, Cat D6TLGP and John Deere Tractor

Komatsu 210LC-11
Purchased and transported back to our workshop for full service and new livery
Straight out to work yesterday to join 3 others of ours on the same site along with 3 x Volvo ADT’s, Cat D6TLGP and John Deere Tractor
... See MoreSee Less

Comment on Facebook

Nice to see you doing well Craig. A nice looking machine and a great choice. Wishing you good luck and a positive future.

Looks good Craig fair play to you 👍

Looking good Craig 👍 👌

Good work 👍👍