ENOVERT - BELLHOUSE - 2019
Cell 8 Engineering at Bellhouse LFS commenced a bit late in the year but with the hope that the weather would hold.
The works were for a long existing client of ours but who had recently changed names(previously Cory Environmental Ltd)
The works involved
Batter toe drain and side wall riser installation
Excavation to formation
Clay Engineering to floor and 2 awkward shaped batters with lots of different shaped contours
Textile and drainage blanket installation
Sump and monitoring point construction
The D6T LGP fully equipped with our recent purchase of GPS was a god send of getting this Cell completed literally within 10 mins of the heavens opening and not stopping through October.
Phew this was a close one but was completed on time and within budget including additional day works.
COMPLETED ON TIME AND IN BUDGET