DOWNLAND - 2019
It was elected to cut the Xmas break short due to the requirement for further engineering works required at Manor Barn Quarry for Downland Trading Ltd.
Pope Plant Ltd and Downland were very fortunate that the Xmas break and New Year were reasonably dry and cold. This enabled the engineering of Cell 2 floor and Side Wall using imported material that meets spec along with site derived material.
“The works were completed in good time ready for EA approval.” Craig Pope 2019
“The project team was led by Craig Pope, who was able to deliver the works professionally, on time and in a cost efficient manner. His hands on approach and clear understanding of the technical challenges meant that he was able to liaise effectively with us and to work competently to any directions he was given.
We have full confidence in Craig and his experienced team and would unreservedly recommend his services to anyone requiring similar works undertaken, particularly if there are technically challenging aspects to it.”