REMOBILISATION TO COMPLETE WORKS
The same situation occurred as Welford in late 2012, where Colnbrook LFS final restoration was incomplete due to inclement weather conditions.
The same situation occurred as Welford in late 2012, where Colnbrook LFS final restoration was incomplete due to inclement weather conditions.
Pope Plant Ltd re-mobilised to complete the excavation, haul and place of 10’000m3 of subsoils and 24’000m3 of topsoil. Before work commenced the perimeter gas main required isolation and disconnection to obtain safe access to main stockpile. Our nominated sub-contractor carried out the disconnection and reposition under the
supervision of the internal Gas to energy team.
A perimeter bund and v-ditch was constructed at the front end of the site in order to deter any unwanted vehicle trespassing.
A new track was placed using site derived materials for the possible placement of further imported restoration materials subject to planning.
“Before work commenced the perimeter gas main required isolation and disconnection to obtain safe access to main stockpile. “
“Any future employer of this company will soon come to note their commitment and ability to complete a project within budget and without undue compensation events.”