BWSL REDHILL - 2018
Cell 8 Upper Engineered lift completion
As a late request Biffa Waste Services approached Pope Plant Ltd to seek the possibility of finishing an upper engineering lift left over from a previous contractor.
Due to the unexpected halt of restoration works with ecology issues on another site, Pope plant were in a position to proceed with these works with immediate effect which suited the client.
The works involved trimming formation, removing water and U/S material from the base in order to find tie-In, Clay Engineering, membrane and protection textile installation.
With help from a trusted sub-contractor previously used for material installation, the works were completed on time and within budget on a part price, part daywork basis.
“I have always found working with Pope Plant to be easy and that they are a dependable contractor with high levels of workmanship.”
Facebook posts




