INSTALLATION OF A PERIMETER UNDER-CAP LEACHATE AND GAS COLLECCTION SYSTEM AND MEMBRANE CAPPING

Pope Plant Ltd was awarded the contract to install a Perimeter Under-Cap Leachate and Gas Collection system + Membrane Capping.

The works involved excavation of waste flanks in order to gain access to the perimeter cell side wall liner. Once the side wall liner was located and exposed a perimeter ditch was constructed following the levels of the side wall. When low points were identified Leachate and Gas collection sumps designed by ourselves and an outside source were installed with the required pipe work to the ditch. The ditch was backfilled with tyre shred and the first 20 metres of 1:2.5 waste batter was re-installed and covered with a 250mm protection layer.

A pozidrain strip material was installed to encourage the flow of perched Leachate into the perimeter system. On completing this installation a 2.0mm DRS HDPE welded membrane was installed as a permanent capping system.

The contract proved very challenging as we were entering a site where various other contractors had previously tried to install control system’s without success. The permanent system installed works extremely well controlling the high flow of Leachate to the plant rather than escaping the site boundary.

“The works involved excavation of waste flanks”


                  

BIFFA-M-STEPHENSON 2011

 

“I have always found working with Pope Plant to be easy and that they are a dependable contractor with high levels of workmanship.”

Find out more about

earthworks

Details

Facebook posts

Comments Box SVG iconsUsed for the like, share, comment, and reaction icons
Tuesday May 7th, 2024
Pope Plant LTD
We are still hiring!!
Last minute let down🤯
Looking for an excavator operator for tomorrow if possible at a soil treatment facility in Surrey
CIS only please apply
Can cover until Monday 13th if tomorrow is too early and before I put the position out to agencies to fill.
Please email me your details 
craig@popeplant.co.uk

We are still hiring!!
Last minute let down🤯
Looking for an excavator operator for tomorrow if possible at a soil treatment facility in Surrey
CIS only please apply
Can cover until Monday 13th if tomorrow is too early and before I put the position out to agencies to fill.
Please email me your details
craig@popeplant.co.uk
... See MoreSee Less

Thursday May 2nd, 2024
Pope Plant LTD
Been a bit of a rush preparing this one
Apart from the hand painted counterweight it’s pretty clean
No time to rub down, fill and spray properly as off to work next week.
Full service inc Hepa filters fitted for the soil treatment facility it’s off to next week in Hertfordshire
Street pads came off nicely leaving like new  grousers on the track pads👍

Been a bit of a rush preparing this one
Apart from the hand painted counterweight it’s pretty clean
No time to rub down, fill and spray properly as off to work next week.
Full service inc Hepa filters fitted for the soil treatment facility it’s off to next week in Hertfordshire
Street pads came off nicely leaving like new grousers on the track pads👍
... See MoreSee Less

Comment on Facebook

Looks good mate fair play to you and your team

Just to add we didn’t paint counterweight !!

Looks well tidy great job 👍

Lovely job looking good 💪💪👍

Thursday April 25th, 2024
Pope Plant LTD

... See MoreSee Less